Capital Campaign Goals
Athletics
Renovated gym’s first floor
Summer 2023
Renovated locker rooms to replace the original pipes from the 1970s and better utilize the gym’s first floor with a new suite of coach offices, a larger team room, and an expanded athletic training room.
Establish a premier cross-country trail on campus
Establish a premier 3.1 mile cross-country trail that winds through Cistercian’s 82 acres with different topographies for cross-country training and meets. Create an outdoor gathering space for the entire community to enjoy at the start/finish of the trail. This trail and gathering space will be a memorial to Steven S Reinemund, Jr. ’99.
The Arts
Build new theater and porch
Renovate arts building
2024-2025
Build a new theater and porch next to the Arts Building with the latest theater technology, adequate backstage storage and workspace, and dressing rooms. A multifunctional space for student social events, performances, dining, and even the Homecoming Dance!
Technology
Renovate the current theater space
2024-2025
Repurpose the existing theater space to include a Form I science lab, a dedicated computer lab for the production of Exodus and The Informer, and a digital photography lab. This will allow the Flex Lab space to be dedicated solely to Cistercian’s growing robotics program.
Faith
Renovate Stations of the Cross trail
Spring 2023
Renovate the Stations of the Cross Trail to provide a safer walking path. An open piazza will welcome classes and groups to gather at the trail beginning, and benches at each Station will provide a place for guests to pray.